CIDB Category

Grade 7 - Building
  • B04 (Kerja-kerja pembinaan bangunan)
  • B13 (Pemasangan jubin)
  • B24 (Kerja penyenggaraan bangunan)
  • B28 (Kerja-kerja ubahsuai)
  • B02 (IBS: Sistem kerangka keluli)
Grade 7 - Civil Engineering
  • CE08 (Sistem perlindungan dan penstabilan cerun)
  • CE43 (Perabot jalan)
  • CE42 (Kerja-kerja mengecat jalan)
  • CE36 (Kerja-kerja tanah)
  • CE34 (Kerja pemasangan konkrit pratuang)
  • CE31 (Struktur laluan kabel bawah tanah)
  • CE30 (Kerja-kerja penstabilan tanah)
  • CE21 (Pembinaan kejuruteraan awam)
  • CE10 (Kerja cerucuk)
  • CE06 (Struktur saliran
  • pengaliran dan kawalan banjir)
  • CE03 (Struktur merin)
  • CE02 (Pembinaan Jambatan dan jeti)
  • CE01 (Pembinaan jalan dan pavemen)
Grade 7 - Mechanical & Electrical Engineering
  • M15 (Kelengkapan mekanikal pelbagai)
No Product Found
CIVIL
Model: CIVIL ENGINEERING
Description: Civil engineers plan, design, and supervise the construction and maintenance of building and infrastructure projects. These projects may include facilities, bridges, roads, tunnels, and water and sewage systems.
BUILDING
Model: BUILDING WORKS
Description: Building construction is the process of adding structure to real property via various techniques. Building construction means the demolition of buildings, the construction of new buildings, the construction of additions to existing buildings, and the necessary alterations of existing buildings, to make them conform to any new additions.
GEOTECHNICAL
Model: GEOTECHNICAL
Description: Slope engineering has been the main focus for housing and infrastructure developments in hilly terrain in Malaysia in recent years, as a result of a shortage or flat or undulating land.
WATER
Model: WATER RETICULATION
Description: water distribution network which is delivered to the consumers. The distribution came from the pressure created from the source and delivered to its destination.
SEWERAGE
Model: SEWERAGE WORKS
Description: A sewerage system, or wastewater collection system, is a network of pipes, pumping stations, and appurtenances that convey sewage from its points of origin to a point of treatment and disposal.
DESIGN
Model: DESIGN & BUILD
Description: In its simplest terms, the design-build construction delivery method replaces the traditional method of awarding separate contracts for design and construction. The contractor, designers, subcontractors, and owner work together as one team to build a project that meets or exceeds the owner's expectations.